Mobile plant for road and infrastructure projects on the move
| Parameter | YHZS35 |
|---|---|
| Theoretical Output | 35 m³/h |
| Mixer Nominal Capacity | 0.75 m³ |
| Aggregate Bins | 2×2.5 m³ |
| Aggregate Weighing | 1000 kg |
| Cement Weighing | 300 kg |
| Fly Ash Weighing | — |
| Water Weighing | 300 kg |
| Admixture Weighing | 40 kg |
| Aggregate Weighing Accuracy | ±2 % |
| Powder Weighing Accuracy | ±1 % |
| Water Weighing Accuracy | ±1 % |
| Admixture Weighing Accuracy | ±1 % |
| Discharging Height | 3.8 m |
| Parameter | YHZS25 | YHZS35 | YHZS50 | YHZS60 | YHZS75 |
|---|---|---|---|---|---|
| Theoretical Output (m³/h) | 25 | 35 | 50 | 60 | 75 |
| Mixer Nominal Capacity (m³) | 0.5 | 0.75 | 1 | 1 | 1.5 |
| Aggregate Bins (m³) | 2×2 | 2×2.5 | 2×3.5 | 2×3.5 | 2×10 |
| Aggregate Weighing (kg) | 1000 | 1000 | 2000 | 2000 | 3000 |
| Cement Weighing (kg) | 300 | 300 | 500 | 600 | 1000 |
| Fly Ash Weighing (kg) | — | — | — | — | — |
| Water Weighing (kg) | 300 | 300 | 300 | 400 | 300 |
| Admixture Weighing (kg) | 40 | 40 | 40 | 40 | 50 |
| Aggregate Weighing Accuracy (%) | ±2 | ±2 | ±2 | ±2 | ±2 |
| Powder Weighing Accuracy (%) | ±1 | ±1 | ±1 | ±1 | ±1 |
| Water Weighing Accuracy (%) | ±1 | ±1 | ±1 | ±1 | ±1 |
| Admixture Weighing Accuracy (%) | ±1 | ±1 | ±1 | ±1 | ±1 |
| Discharging Height (m) | 3.8 | 3.8 | 3.8 | 3.8 | 3.8 |
Compact stationary plant for precast yards and small commercial production
Entry-level commercial plant with reliable twin-shaft mixing
Cost-effective plant for medium construction and precast applications
Best-selling model balancing output, footprint and investment